In an education building the calendar is fixed: the school must be ready for the start of the school year. We completed ten light steel schools, seven in Tokat Turhal and three in Manisa, each in 40 days, and opened them for teaching. We use the same method for classroom blocks, administrative buildings, dormitories and kindergartens.
Factory production and site preparation run in parallel; the structure goes up within weeks and finishing works are planned to the calendar.
Structural and seismic calculations follow the current earthquake code; escape routes, fire protection and accessibility are built into the design from the start.
Highly insulated panels and the right window choice lower heating and cooling costs; acoustic partition walls block sound between classrooms.
Light steel structural system for multi-classroom schools and campus buildings; the method used for the Tokat and Manisa schools.
Explore →Prefabricated panel system for small schools, kindergartens and course buildings.
Explore →Dormitory units in room layout for boarding and hostel needs.
Explore →Kitchen and dining modules for the campus canteen and cafeteria.
Explore →Number of classrooms, laboratories, administrative and social areas are determined; the floor plan is prepared.
Structural, architectural and services designs are prepared; the permit process is carried out.
The structural panels of the blocks are produced simultaneously at the factory.
Blocks are assembled in a single site setup; facade, partitions and services are completed and the school is handed over.

A total of 10 light steel school projects — seven in Turhal, Tokat and three in Manisa — were each built in a record 40 days and handed over fully complete for educational use.
Details
Crossing borders: the Jon Residential Project and bespoke housing production, successfully delivered in the United States with fast manufacturing and practical installation.
DetailsShare your site data; we will get back within 48 hours with a unit list and schedule.