Construction and operation buildings for power plants and solar farms

Solar and wind plants are built on large, open land that usually has no infrastructure. The construction phase needs a site office, security and storage; the operation phase needs a switchboard room, a maintenance team office and a permanent security building. We produce container and prefabricated buildings that cover both phases with a single plan.

What the site needs

Land without infrastructure

Grid, water and road usually come later. Units are delivered with their own service lines, ready to connect to a generator and a tank.

Space for electrical equipment

Ventilated, insulated technical containers with pre-cut cable entries are used for inverters, switchboards and transformers.

From construction to operation

The site office and storage become the maintenance building in the operation phase; units are selected with this in mind from the start.

Solutions we recommend

How we proceed

01

Needs list

Separate unit lists are prepared for the construction and operation phases.

02

Technical rooms

Equipment dimensions, heat load and cable routes are worked into the technical container design.

03

Production and shipping

Units are completed at the factory and planned to transport dimensions for remote sites.

04

Installation

Placement, earthing and line connections are made; the unit is put into use.

Reference projects

Modular container city in a disaster area, aerial view with a stadium nearby

Container Cities / Kahramanmaraş & Adıyaman

Fully Equipped Modular Container Cities for Thousands in the Disaster Zone

Details
Eskişehir modular sales kiosk with wood-look facade and glass shopfront

Modular Sales Kiosks

Modular Sales Kiosks That Enrich Eskişehir's Urban Architecture

Details
Frequently Asked Questions

Frequently asked questions

How do the units work on a site with no grid connection?
Units are prepared to connect to a generator, solar panels and a water tank; service lines and connection points are left ready at the factory. No additional fabrication is needed to switch over when the grid arrives.
Can a container be used for switchboards and inverters?
Yes. Ventilation, insulation, cable entries and floor load capacity are designed from the equipment data; the equipment manufacturer's environmental requirements are taken as the basis.
Does the site office stay in use during the operation phase?
Yes, if units are selected with both phases in mind from the start. The site office becomes the maintenance team office and the storage becomes a spare parts store; if a change of location is needed, the units are moved.