Aşıcı Grup Prefabrik
Language
Follow Us
Industries

Light steel and prefabricated buildings for hospitals and healthcare facilities

A healthcare building needs speed, safety and hygiene at the same time. After the earthquake we produced the light steel structural systems of the 300-bed Defne State Hospital and the 400-bed Training and Research Hospital in Hatay; both went into service within 60 days. We apply the same method to clinics, infirmaries and temporary health units.

What the site needs

Earthquake safety

Healthcare buildings must keep working after a disaster. With its low mass and ductility, the light steel structural system performs well under earthquake loads.

Wide spans and dense services

Operating theatres, imaging and intensive care need wide spans and dense mechanical services; the structure and service routes are designed together.

Hygienic surfaces

Interior surfaces are finished with easy-to-clean, seamless, disinfectant-resistant materials; wet rooms and the clean-dirty flow plan are set from the start.

Solutions we recommend

How we proceed

01

Programme and capacity

Bed count, departments and flow diagram are finalised together with the health administration.

02

Structural and services design

Structure, fire protection and mechanical services are resolved in the same model.

03

Factory production

Structural members are produced on roll-forming lines; shipping is planned block by block.

04

Assembly and handover

Block-by-block assembly; finishing works and services integration run in parallel.

Reference projects

Hatay Defne State Hospital prefabricated steel healthcare campus, aerial view

Defne State Hospital / Hatay / Türkiye

A modern healthcare campus in prefabricated steel with 28,000 m² of enclosed space and 300 beds, built on a 79,000 m² site.

Details
Hatay Training and Research Hospital steel blocks and car park, aerial view

Training and Research Hospital (Antakya) / Hatay / Türkiye

A modern healthcare campus in prefabricated steel with 22,000 m² of enclosed space and 400 beds, built on a 54,000 m² site.

Details
Frequently Asked Questions

Frequently asked questions

How long does a light steel hospital building take to complete?
Producing the structural systems of the 300- and 400-bed hospitals in Hatay took 45 days, and the buildings went into service within 60 days. The time depends on capacity, site readiness and the scope of finishing works.
Is a light steel hospital a permanent building?
Yes. The light steel structural system is designed for permanent use, is subject to building regulations and is licensed; the hospitals in Hatay operate as permanent healthcare campuses.
Is a container suitable for a temporary health unit?
Containers are suitable for infirmary, examination and vaccination units; medical equipment, washbasin and air conditioning are installed at the factory. For functions such as inpatient wards and operating theatres, a prefabricated or light steel building is recommended.
Get a Quote

Get a quote for this industry

Share your site data; we will get back within 48 hours with a unit list and schedule.