Rehber · 27.11.2026 · 4 dk okuma

C Profile Prices

C profile price varies with section, wall thickness, weight per meter, galvanizing grade and quantity. Quote comparison and calculation method.

C Profile Price Starts with Weight

C profile price is usually quoted per meter or per kilogram. Since sheet steel is the main cost item in steel profiles, the price is largely derived from the weight of the profile. When the wall thickness increases at the same cross-section, the weight per meter rises, and the price rises with it. This page does not provide a current price list; because steel prices fluctuate, it explains the items that make up the price and how to compare quotes instead of giving figures.

The technical table on Aşıcı Grup's C profile product page lists sizes with a section height between 63 and 300 mm and a wall thickness between 0.75 and 2.50 mm. The table gives the weight per meter, area and moment of inertia values for each section. For example, the C63x41x9x1 section is listed at 1.24 kg per meter, and the C300x75x75x2.5 section at 9.40 kg per meter. This weight difference of roughly seven and a half times between the two ends accounts for most of the price difference as well.

Calculating the Total Cost from Weight per Meter

While waiting for a quote, you can make your own estimate. The method is simple:

  • Find the weight per meter for the section in the table
  • Multiply the profile length by the quantity to get the total meters
  • Multiply the total meters by the weight per meter to get the total kilograms
  • Add an allowance for cutting and end waste
  • Compare the kilograms you obtained with the unit price in the quote

The product page has a weight calculation tool that does this calculation; you select the size, enter the length and quantity, and see the weight per meter, total kilograms and the amount including the waste allowance. Comparing the quote with your own calculation when it arrives is the easiest way to tell whether the unit price is given per meter or per kilogram.

Wall Thickness: Both Too Much and Too Little Cost More

Wall thickness determines both load-bearing capacity and price. A profile chosen thinner than necessary deforms or buckles under load. A profile chosen thicker than necessary adds weight and cost to the structure for no reason.

Section selection is a matter for structural calculation. In light steel framing, small sections are used for wall and floor members, while taller sections are used for roof trusses and solar power plant (PV) support systems with larger spans. If it is not known which load the section was selected for, the technical office should be consulted before requesting a quote.

Galvanized Coating and Sheet Grade

Another factor affecting the price is the grade of the sheet the profile is made from and its galvanized coating. On its product page, Aşıcı Grup states that its C profiles are produced from S350GD+Z275 grade galvanized sheet with a galvanized coating conforming to the BS EN 10346 standard. As the coating amount increases, corrosion resistance rises and so does the unit cost.

The service environment is decisive when choosing the coating class:

  • In enclosed, dry environments the standard coating is generally sufficient
  • In coastal areas, chemical plants and continuously humid environments, a higher coating class is required
  • For PV support systems that will remain outdoors for a long time, coating life should be assessed separately

If the coating class is not stated in the quote, two quotes cannot be compared.

Production Method and Weld-Free Connection

C profiles are produced by cold forming galvanized sheet on CNC-controlled roll-forming lines. In this method the sheet is not heat treated, and since no welding is used, the galvanized coating is not damaged. The profile geometry is suitable for bolted and riveted connections; this allows fast assembly on site and, when needed, disassembly and reassembly. Fast assembly reduces on-site labor costs and should be taken into account when evaluating the total cost.

Quantity, Cutting and Delivery

In bulk orders the unit cost generally falls, because cutting, loading and transport costs are spread over more products. Other logistics factors that affect the price are as follows:

  • Profile length and special cut dimensions
  • Hole pattern and additional processing requests
  • The province and district of delivery
  • Loading and unloading conditions

Different sections and wall thicknesses can also be produced according to the project structural design; for sizes outside the catalog, the technical office should be consulted.

Information to Provide When Requesting a Quote

Sharing the following information helps in getting a quick and comparable quote:

  • Profile section and wall thickness, if known
  • Total length in meters or quantity
  • Area of use: light steel framing, roof, load-bearing system or PV installation
  • Delivery location
  • Structural report or technical drawing, if available

In the quote you receive, check whether the unit price is given per meter or per kilogram, the coating class, and whether VAT and transport are included.

Frequently Asked Questions

What do C profile prices depend on?

They depend on the section size, wall thickness, sheet and galvanizing grade, order quantity and delivery conditions. The current steel sheet price also limits the validity period of the quote.

How is the most suitable C profile size determined?

It is determined by structural calculation according to the load and span in the area of use. If the size is not known, you can get support from the technical office by providing the intended use and span information.

Is the price given per meter or per kilogram?

This varies from quote to quote. Since the weight per meter is known, the two methods can be converted into each other and a comparison can be made.

Is there a price advantage for bulk orders?

As quantity increases, the unit cost generally falls because cutting, loading and transport costs are spread over more products. The rate varies with size and quantity.

Is transport included in the price?

Transport varies with the delivery distance and loading method and should be stated separately in the quote.

Get a Quote

Get a price quote for this product

With dimensions and equipment tailored to your project, we will get back to you within 48 hours.

Read more

Other Articles

Solar PV Steel Mounting Structure and Profile Installation
Guide

Solar PV Steel Mounting Structure and Profile Installation

Ground-mounted and rooftop types, galvanized profile, weld-free bolted connection, and structural calculation inputs…

28.11.2026 · 4 dk okuma →
Light Steel Profile Prices and Quote Calculation
Guide

Light Steel Profile Prices and Quote Calculation

The price of a light steel profile is determined by the section, wall thickness, galvanized class and quantity. The…

28.11.2026 · 4 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

Construction Site Camp Setup and Planning

How is a construction site camp planned? The layout of dormitory, canteen, WC-shower, and office units, container and…

28.11.2026 · 4 dk okuma →
Prefabricated Building Companies in Ankara
Guide

Prefabricated Building Companies in Ankara

Criteria to consider when choosing a prefabricated building company in Ankara: production location, building types…

27.11.2026 · 4 dk okuma →
Modular Home Prices
Guide

Modular Home Prices

Modular home prices vary depending on the number of modules, floor area, insulation, wet areas, and transport…

27.11.2026 · 4 dk okuma →
What Is Container Thermal Insulation?
Guide

What Is Container Thermal Insulation?

Rock wool and polyurethane panel in container thermal insulation, thickness selection, thermal bridges, and cost.…

23.11.2026 · 4 dk okuma →
What Is Steel House Thermal Insulation?
Guide

What Is Steel House Thermal Insulation?

Panel and fill types, thermal bridge issues, thickness selection, and cost in steel house thermal insulation. How is…

23.11.2026 · 4 dk okuma →
What Is Prefabricated House Thermal Insulation?
Guide

What Is Prefabricated House Thermal Insulation?

Panel types, thickness selection, thermal bridges, and cost factors in prefabricated house thermal insulation. Points…

23.11.2026 · 4 dk okuma →
Galvanized light steel profiles stacked in the production hall, overhead crane
Guide

Is a Permit Required for a Container House?

The answer to whether a permit is required for a container house depends on the land's qualification, intended use…

23.11.2026 · 4 dk okuma →
Two-Storey Container
Guide

Two-Storey Container

Two-storey container types, static and technical details, areas of use and frequently asked questions. Get…

23.11.2026 · 3 dk okuma →
Galvanized light steel profiles stacked in the production hall, overhead crane
Guide

Sandwich Panel Container

Sandwich panel container types, the difference between PUR and rock wool panels, technical specifications and usage…

22.11.2026 · 3 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

100 Square Meter Steel House Prices

The load-bearing system, facade, insulation, and installation determine 100 square meter steel house prices. Cost…

22.11.2026 · 3 dk okuma →
Galvanized light steel profiles stacked in the production hall, overhead crane
Guide

Prefabricated Building Price Per Square Meter

The price per square meter of a prefabricated building is determined by building type, load-bearing system…

22.11.2026 · 3 dk okuma →
Garden House Prices
Guide

Garden House Prices

Garden house prices are determined by square meters, insulation, installation and assembly conditions. Cost items and…

22.11.2026 · 3 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

100 Square Meter Prefabricated House Prices

The items that determine 100 square meter prefabricated house prices, plan differences, and choices that reduce cost.…

22.11.2026 · 3 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

Single-Story Prefabricated House

Single-story prefabricated house plans, square meter options, technical specifications, and usage areas. Get…

20.11.2026 · 3 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

Turnkey Prefabricated Building

Types, technical specifications and usage areas of turnkey prefabricated buildings. A single-source solution from…

20.11.2026 · 3 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

Container Companies

What do container companies do, how are they selected? Container types, points to check in the technical…

20.11.2026 · 3 dk okuma →
Galvanized light steel profiles stacked in the production hall, overhead crane
Guide

Container Prices

Container prices are determined by intended use, panel and insulation, interior equipment, quantity, and shipping.…

20.11.2026 · 3 dk okuma →
Galvanized light steel lattice truss on the factory floor, AFAD containers behind
Guide

Building Permits for Prefabricated Buildings: How Does the Licensing Process Work?

Do prefabricated and light steel buildings need a permit? Zoning status, architectural and structural design, building

22.09.2026 · 7 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

What Makes Up the Cost of a Prefabricated Building? An Item-by-Item Budget Guide

The items that make up the budget of a prefabricated or container building: structural system, panels and insulation,

22.09.2026 · 8 dk okuma →
Galvanized light steel profiles stacked in the production hall, overhead crane
Guide

From Order to Handover: How Does the Prefabricated Building Process Work?

The steps after ordering a prefabricated, container or light steel building: survey, design, production, quality

22.09.2026 · 6 dk okuma →
Galvanized steel coil carried by forklift, Aşıcı Grup production plant
Guide

How Many Years Does a Prefabricated or Light Steel Building Last? A Maintenance Guide

The factors that determine the service life of prefabricated, container and light steel buildings; an annual

22.09.2026 · 6 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

Prefabricated House Costs in 2026: 7 Factors That Set the Price

What makes prefabricated house prices vary? We explain the seven main cost drivers — floor area, insulation, number of…

01.08.2026 · 6 min read →
Galvanized light steel profiles stacked in the production hall, overhead crane
Comparison

Container or Prefabricated Building? A Comparison to Help You Choose

What are the differences between a container and a prefabricated building? We compare the two on portability, cost…

20.07.2026 · 5 min read →
Galvanized light steel lattice truss on the factory floor, AFAD containers behind
Engineering

Are Light Steel Buildings Really Earthquake-Resistant?

Why are light steel buildings considered earthquake-safe? We explain their seismic performance in terms of low weight…

05.07.2026 · 7 min read →
Galvanized steel coil carried by forklift, Aşıcı Grup production plant
Sustainability

Fully Recyclable Steel and the Future of Sustainable Construction

Why is steel the key to sustainable building? We look at steel construction through recycling, low waste, energy…

18.06.2026 · 5 min read →