Modular home prices vary depending on the number of modules, floor area, insulation, wet areas, and transport conditions. Information to prepare before requesting a quotation.
When people ask about the price of a modular home, the expected answer is usually a unit price per square meter. Yet two modular homes with the same floor area can differ significantly in total cost depending on the number of modules, the number of wet areas, the insulation thickness, and the site access conditions. This page does not provide a current price list. Its purpose is to explain which items make up the total cost when requesting a quotation and how to compare quotations.
A modular building is assembled on site from volumetric units produced in a factory. Because most of the production takes place in an enclosed workshop, the amount of work on site is reduced. This does not directly lower the price, but it changes where the cost is concentrated: on-site labor decreases, while factory labor, transportation, and crane costs come to the fore.
A small single-module building and a house made of three or four joined modules are produced with the same logic, but their cost structures differ. Each additional module requires extra structural detailing, waterproofing, and interior finishing continuity along the joint line. If the modules are to be stacked, the structural calculations and connection elements change as well.
Depending on the number of modules, the following items should appear separately in the quotation:
There is a width and height limit for a module to be transported by road. This limit determines the dimensions of the design and is an important cause of price differences.
In modular homes, the kitchen and bathroom are the areas where the price changes fastest. In the Aşıcı Grup product range, modular bathroom and kitchen pods are offered as separate products; this means the wet area can be completed in the factory and arrive on site ready for installation. When comparing quotations, the following should be checked:
A quotation that does not state the fit-out level cannot be compared with those from other manufacturers.
In a modular home, thermal insulation is provided through options such as sandwich panels, rock wool, or polyurethane fill. As the thickness increases, the initial cost also increases, but heating and cooling costs decrease. Having the insulation thickness stated in millimeters in the quotation is the most reliable way to make a comparison.
The roof detail should be treated in the same way. A flat roof, a mono-pitch roof, and a gable roof require different amounts of material and labor. The waterproofing and drainage solution on the roof determines the service life of the building; therefore, it should not be seen as an item to save on.
Modules completed in the factory are transported to the site by truck and lowered into place by crane. For this reason, the transport cost in the quotation depends on three variables: the distance from the factory to the plot, the number of modules, and how easily vehicles can access the plot. On a plot with narrow roads or a slope, a smaller vehicle or a longer crane time may be required.
Ground preparation is also often left out of the quotation. A modular home is usually placed on a reinforced concrete raft foundation, strip foundation, or steel piers. The foundation type is determined by the ground conditions and local zoning regulations. When requesting a quotation, it should be asked explicitly whether the foundation work is included in the scope.
A modular home can be planned as temporary accommodation or as a permanent dwelling. Structures to be built as permanent dwellings are subject to zoning legislation, and the zoning status of the plot should be checked with the municipality. Answering this question before discussing price prevents revisions later on.
Sharing the following information speeds up the process for a preliminary quotation:
When comparing quotations, it should be checked one by one whether the items for transport, crane, assembly, foundation, and VAT are included. The same total figure can mean different scopes.
Aşıcı Grup Prefabrik has been working in light steel, prefabricated, container, and modular construction since 2003 and carries out its production at its facility in Polatlı, Ankara. The modular buildings product group includes bathroom pods, kitchen pods, and modular pods. Which solution suits your project is assessed together with the intended use and plot information.
Floor area is an important factor, but the number of modules, fit-out level, insulation, and transport conditions also determine the total cost. For this reason, the exact figure is given in a project-specific quotation.
This varies from one quotation to another. Whether transport, crane, assembly, and foundation work are included in the scope should be asked in writing.
In multi-module buildings, the cost structure changes because the joint details, structural calculations, and number of transports increase. The exact difference is seen in a project-specific quotation.
The location of the plot, the intended use, the desired floor area, and the infrastructure status are generally sufficient for a preliminary quotation. If a plan sketch is available, sharing it makes the quotation more precise.
Structures to be used as permanent dwellings are subject to zoning legislation. The status of the plot should be checked with the relevant municipality before requesting a quotation.
With dimensions and equipment tailored to your project, we will get back to you within 48 hours.

Ground-mounted and rooftop types, galvanized profile, weld-free bolted connection, and structural calculation inputs…
28.11.2026 · 4 dk okuma →
The price of a light steel profile is determined by the section, wall thickness, galvanized class and quantity. The…
28.11.2026 · 4 dk okuma →
How is a construction site camp planned? The layout of dormitory, canteen, WC-shower, and office units, container and…
28.11.2026 · 4 dk okuma →
Criteria to consider when choosing a prefabricated building company in Ankara: production location, building types…
27.11.2026 · 4 dk okuma →
C profile price varies with section, wall thickness, weight per meter, galvanizing grade and quantity. Quote…
27.11.2026 · 4 dk okuma →
Rock wool and polyurethane panel in container thermal insulation, thickness selection, thermal bridges, and cost.…
23.11.2026 · 4 dk okuma →
Panel and fill types, thermal bridge issues, thickness selection, and cost in steel house thermal insulation. How is…
23.11.2026 · 4 dk okuma →
Panel types, thickness selection, thermal bridges, and cost factors in prefabricated house thermal insulation. Points…
23.11.2026 · 4 dk okuma →
The answer to whether a permit is required for a container house depends on the land's qualification, intended use…
23.11.2026 · 4 dk okuma →
Two-storey container types, static and technical details, areas of use and frequently asked questions. Get…
23.11.2026 · 3 dk okuma →
Sandwich panel container types, the difference between PUR and rock wool panels, technical specifications and usage…
22.11.2026 · 3 dk okuma →
The load-bearing system, facade, insulation, and installation determine 100 square meter steel house prices. Cost…
22.11.2026 · 3 dk okuma →
The price per square meter of a prefabricated building is determined by building type, load-bearing system…
22.11.2026 · 3 dk okuma →
Garden house prices are determined by square meters, insulation, installation and assembly conditions. Cost items and…
22.11.2026 · 3 dk okuma →
The items that determine 100 square meter prefabricated house prices, plan differences, and choices that reduce cost.…
22.11.2026 · 3 dk okuma →
Single-story prefabricated house plans, square meter options, technical specifications, and usage areas. Get…
20.11.2026 · 3 dk okuma →
Types, technical specifications and usage areas of turnkey prefabricated buildings. A single-source solution from…
20.11.2026 · 3 dk okuma →
What do container companies do, how are they selected? Container types, points to check in the technical…
20.11.2026 · 3 dk okuma →
Container prices are determined by intended use, panel and insulation, interior equipment, quantity, and shipping.…
20.11.2026 · 3 dk okuma →
Do prefabricated and light steel buildings need a permit? Zoning status, architectural and structural design, building
22.09.2026 · 7 dk okuma →
The items that make up the budget of a prefabricated or container building: structural system, panels and insulation,
22.09.2026 · 8 dk okuma →
The steps after ordering a prefabricated, container or light steel building: survey, design, production, quality
22.09.2026 · 6 dk okuma →
The factors that determine the service life of prefabricated, container and light steel buildings; an annual
22.09.2026 · 6 dk okuma →
What makes prefabricated house prices vary? We explain the seven main cost drivers — floor area, insulation, number of…
01.08.2026 · 6 min read →
What are the differences between a container and a prefabricated building? We compare the two on portability, cost…
20.07.2026 · 5 min read →
Why are light steel buildings considered earthquake-safe? We explain their seismic performance in terms of low weight…
05.07.2026 · 7 min read →
Why is steel the key to sustainable building? We look at steel construction through recycling, low waste, energy…
18.06.2026 · 5 min read →