Ground-mounted and rooftop types, galvanized profile, weld-free bolted connection, and structural calculation inputs in a solar PV steel mounting structure. Information needed for a quote.
In solar power plants, photovoltaic panels are mounted at a set tilt on a steel frame. This frame is called a solar PV steel mounting structure. The system consists of posts, beams, and panel-holding connection elements. Its job is to hold the panels at the correct angle and securely for years outdoors, under wind, snow, rain, and sun. Although the plant's output depends on the panel, the panel staying in place depends on the mounting structure; for this reason, the choice of mounting structure directly affects the long-term performance of the investment.
Solar PV mounting structures fall into two main groups depending on the installation site.
They are used in plants built on open land. The posts rest on piles or concrete foundations, with beams and panel support profiles above. In these systems, the slope of the land, the ground conditions, and the wind load determine the design. Since multi-row arrays can be built on large sites, fast installation progress is important.
They are used on the roofs of industrial facilities, warehouses, and similar buildings. The goal here is to place the panels at a suitable angle without putting unnecessary load on the existing roof. The roof type, whether trapezoidal sheet, sandwich panel, or reinforced concrete, changes the connection detail. Before installation, it must be checked whether the structure can carry the load to be added to the roof.
The mounting structure is not the same for every solar PV project. The calculation is determined by the following inputs:
Based on these inputs, the section size and wall thickness are determined by structural calculation. A profile thinner than necessary leaves the load-bearing capacity insufficient, while a profile thicker than necessary needlessly increases steel use and cost. Wind load is especially decisive on open land; because the panel surface acts like a sail in the wind, the connection points and posts must be calculated for this load.
A solar PV mounting structure stays outdoors for a long time; therefore, corrosion resistance comes first. Galvanized profile is preferred for this purpose. Durability depends on the galvanized coating class and the environment of use. In a dry environment the service life is long; in coastal areas, chemical plants, and constantly humid environments, a higher coating class should be selected. Although the coating class may look like a small item in the project's initial investment cost, it is one of the items that determine the maintenance requirement over the operating life of the plant.
Aşıcı Grup produces its solar PV mounting profiles at its Polatlı facility on CNC roll-forming lines using the cold-forming method. The information stated on the company's steel profiles page is as follows:
In Aşıcı Grup's steel profile product group, C, U, and J profiles are available in addition to the solar PV profile. In roof applications, the roof support profile is also part of this group.
Welding changes the material properties of steel in the heat-affected zone and damages the galvanized coating. The point where the coating is damaged is where corrosion can start. This problem does not occur with bolted and riveted connections. In addition, installation on site is faster, and the ability to disassemble and reassemble is preserved. In projects like solar PV that run on open land with tight schedules, this feature is important.
For a sound mounting structure quote to be prepared, you need to share the following:
If this information is missing, the quote remains general. When comparing quotes, make sure that the section size and wall thickness, the galvanizing class, and the connection method are stated in writing; two quotes that look the same may differ in these items. For the requested dimensions and thickness, the technical office should be consulted. Once you send your information, the Aşıcı Grup team will get back to you within 48 hours.
It is made of galvanized steel profile. Aşıcı Grup produces its profiles from high-strength galvanized sheet on CNC roll-forming lines.
Welding changes the properties of steel in the heat-affected zone and damages the galvanized coating. This does not happen with bolted and riveted connections; installation is faster, and the system can be disassembled and reassembled.
Ground-mounted systems rest on piles or concrete foundations and are designed according to site conditions. Rooftop systems are installed with connection details suited to the existing roof and without putting unnecessary load on it.
Catalog dimensions are for the most common use. If the project's structural design requires it, different sections and wall thicknesses can be produced; for this, the technical office must be consulted.
No. Durability depends on the coating class and the environment. In coastal areas, chemical plants, and constantly humid environments, a higher coating class should be selected.
With dimensions and equipment tailored to your project, we will get back to you within 48 hours.

The price of a light steel profile is determined by the section, wall thickness, galvanized class and quantity. The…
28.11.2026 · 4 dk okuma →
How is a construction site camp planned? The layout of dormitory, canteen, WC-shower, and office units, container and…
28.11.2026 · 4 dk okuma →
Criteria to consider when choosing a prefabricated building company in Ankara: production location, building types…
27.11.2026 · 4 dk okuma →
C profile price varies with section, wall thickness, weight per meter, galvanizing grade and quantity. Quote…
27.11.2026 · 4 dk okuma →
Modular home prices vary depending on the number of modules, floor area, insulation, wet areas, and transport…
27.11.2026 · 4 dk okuma →
Rock wool and polyurethane panel in container thermal insulation, thickness selection, thermal bridges, and cost.…
23.11.2026 · 4 dk okuma →
Panel and fill types, thermal bridge issues, thickness selection, and cost in steel house thermal insulation. How is…
23.11.2026 · 4 dk okuma →
Panel types, thickness selection, thermal bridges, and cost factors in prefabricated house thermal insulation. Points…
23.11.2026 · 4 dk okuma →
The answer to whether a permit is required for a container house depends on the land's qualification, intended use…
23.11.2026 · 4 dk okuma →
Two-storey container types, static and technical details, areas of use and frequently asked questions. Get…
23.11.2026 · 3 dk okuma →
Sandwich panel container types, the difference between PUR and rock wool panels, technical specifications and usage…
22.11.2026 · 3 dk okuma →
The load-bearing system, facade, insulation, and installation determine 100 square meter steel house prices. Cost…
22.11.2026 · 3 dk okuma →
The price per square meter of a prefabricated building is determined by building type, load-bearing system…
22.11.2026 · 3 dk okuma →
Garden house prices are determined by square meters, insulation, installation and assembly conditions. Cost items and…
22.11.2026 · 3 dk okuma →
The items that determine 100 square meter prefabricated house prices, plan differences, and choices that reduce cost.…
22.11.2026 · 3 dk okuma →
Single-story prefabricated house plans, square meter options, technical specifications, and usage areas. Get…
20.11.2026 · 3 dk okuma →
Types, technical specifications and usage areas of turnkey prefabricated buildings. A single-source solution from…
20.11.2026 · 3 dk okuma →
What do container companies do, how are they selected? Container types, points to check in the technical…
20.11.2026 · 3 dk okuma →
Container prices are determined by intended use, panel and insulation, interior equipment, quantity, and shipping.…
20.11.2026 · 3 dk okuma →
Do prefabricated and light steel buildings need a permit? Zoning status, architectural and structural design, building
22.09.2026 · 7 dk okuma →
The items that make up the budget of a prefabricated or container building: structural system, panels and insulation,
22.09.2026 · 8 dk okuma →
The steps after ordering a prefabricated, container or light steel building: survey, design, production, quality
22.09.2026 · 6 dk okuma →
The factors that determine the service life of prefabricated, container and light steel buildings; an annual
22.09.2026 · 6 dk okuma →
What makes prefabricated house prices vary? We explain the seven main cost drivers — floor area, insulation, number of…
01.08.2026 · 6 min read →
What are the differences between a container and a prefabricated building? We compare the two on portability, cost…
20.07.2026 · 5 min read →
Why are light steel buildings considered earthquake-safe? We explain their seismic performance in terms of low weight…
05.07.2026 · 7 min read →
Why is steel the key to sustainable building? We look at steel construction through recycling, low waste, energy…
18.06.2026 · 5 min read →