Two-storey container types, static and technical details, areas of use and frequently asked questions. Get information and a quote from Aşıcı Grup.
A two-storey container is a type of prefabricated structure built on a steel chassis and positioned vertically in two storeys. Compared to single-storey container solutions, it provides more usable area on the same plot of land, which is why it is preferred for construction sites, factory grounds, schools and accommodation projects with limited land. The upper storey is accessed via a staircase or an external staircase system, and static integrity between the lower and upper modules is established with connection elements.
Two-storey container projects can be set up as single units or as multi-block complexes. The combination container featured on Aşıcı Grup's container structures page also describes large-area structures formed by adding two or more modules side by side or on top of each other.
Insulation and interior surface materials are determined according to accommodation comfort requirements.
Electrical wiring and interior partition walls are adapted according to project requirements.
These are large-scale settlements formed by combining multiple modules side by side and on top of each other.
In the production of two-storey containers, the choices of chassis, steel profile and insulation material vary according to the project. Since the load of the upper module is transferred to the ground through the corner columns of the lower module, the lower storey's chassis must be calculated to carry this load. When comparing quotes, it is useful to ask for the following information to be clearly stated:
Additional information on chassis details can be found on the container chassis page. For projects requiring ease of transport and installation, the knockdown container option can also be considered.
Two-storey container solutions are widely used in projects that require land efficiency:
In each application, the number of modules, floor plan and interior fittings are determined according to the project requirements.
Aşıcı Grup Prefabrik has been operating in the field of containers, prefabricated and light steel structures since 2003 and manufactures at its facility in Polatlı. As stated on the company's website, the container chassis is produced from cold roll-formed profiles up to 3 mm thick, in accordance with static calculations. The products page can be reviewed for the general product range.
Capacity varies according to the number of modules and the room plan. The number of people can be calculated once the bed layout, whether wet areas will be on each floor, and the need for common areas are clarified.
Installation time varies depending on the number of modules, site conditions and preparatory work. Ground readiness and advance planning of crane access are the two issues that most affect the duration.
A two-storey container offers more usable area on the same plot of land, but requires additional staircases, connection elements and static calculations.
With dimensions and equipment tailored to your project, we will get back to you within 48 hours.

Ground-mounted and rooftop types, galvanized profile, weld-free bolted connection, and structural calculation inputs…
28.11.2026 · 4 dk okuma →
The price of a light steel profile is determined by the section, wall thickness, galvanized class and quantity. The…
28.11.2026 · 4 dk okuma →
How is a construction site camp planned? The layout of dormitory, canteen, WC-shower, and office units, container and…
28.11.2026 · 4 dk okuma →
Criteria to consider when choosing a prefabricated building company in Ankara: production location, building types…
27.11.2026 · 4 dk okuma →
C profile price varies with section, wall thickness, weight per meter, galvanizing grade and quantity. Quote…
27.11.2026 · 4 dk okuma →
Modular home prices vary depending on the number of modules, floor area, insulation, wet areas, and transport…
27.11.2026 · 4 dk okuma →
Rock wool and polyurethane panel in container thermal insulation, thickness selection, thermal bridges, and cost.…
23.11.2026 · 4 dk okuma →
Panel and fill types, thermal bridge issues, thickness selection, and cost in steel house thermal insulation. How is…
23.11.2026 · 4 dk okuma →
Panel types, thickness selection, thermal bridges, and cost factors in prefabricated house thermal insulation. Points…
23.11.2026 · 4 dk okuma →
The answer to whether a permit is required for a container house depends on the land's qualification, intended use…
23.11.2026 · 4 dk okuma →
Sandwich panel container types, the difference between PUR and rock wool panels, technical specifications and usage…
22.11.2026 · 3 dk okuma →
The load-bearing system, facade, insulation, and installation determine 100 square meter steel house prices. Cost…
22.11.2026 · 3 dk okuma →
The price per square meter of a prefabricated building is determined by building type, load-bearing system…
22.11.2026 · 3 dk okuma →
Garden house prices are determined by square meters, insulation, installation and assembly conditions. Cost items and…
22.11.2026 · 3 dk okuma →
The items that determine 100 square meter prefabricated house prices, plan differences, and choices that reduce cost.…
22.11.2026 · 3 dk okuma →
Single-story prefabricated house plans, square meter options, technical specifications, and usage areas. Get…
20.11.2026 · 3 dk okuma →
Types, technical specifications and usage areas of turnkey prefabricated buildings. A single-source solution from…
20.11.2026 · 3 dk okuma →
What do container companies do, how are they selected? Container types, points to check in the technical…
20.11.2026 · 3 dk okuma →
Container prices are determined by intended use, panel and insulation, interior equipment, quantity, and shipping.…
20.11.2026 · 3 dk okuma →
Do prefabricated and light steel buildings need a permit? Zoning status, architectural and structural design, building
22.09.2026 · 7 dk okuma →
The items that make up the budget of a prefabricated or container building: structural system, panels and insulation,
22.09.2026 · 8 dk okuma →
The steps after ordering a prefabricated, container or light steel building: survey, design, production, quality
22.09.2026 · 6 dk okuma →
The factors that determine the service life of prefabricated, container and light steel buildings; an annual
22.09.2026 · 6 dk okuma →
What makes prefabricated house prices vary? We explain the seven main cost drivers — floor area, insulation, number of…
01.08.2026 · 6 min read →
What are the differences between a container and a prefabricated building? We compare the two on portability, cost…
20.07.2026 · 5 min read →
Why are light steel buildings considered earthquake-safe? We explain their seismic performance in terms of low weight…
05.07.2026 · 7 min read →
Why is steel the key to sustainable building? We look at steel construction through recycling, low waste, energy…
18.06.2026 · 5 min read →