Rehber · 22.09.2026 · 6 dk okuma

From Order to Handover: How Does the Prefabricated Building Process Work?

The steps after ordering a prefabricated, container or light steel building: survey, design, production, quality control, shipping, assembly and handover. The duration of each step, what is expected of you and the points that cause delay.

What happens after the quote is signed? What our customers most want to know is what will be expected of them at which stage. Below we explain the process from order to handover for container, prefabricated and light steel buildings, with typical durations and the points that cause delay. Durations vary between stock products and project-specific production; the exact schedule is written in the contract.

1. Survey and list of needs

Site visit or remote information gathering: plot dimensions, ground, access, climate and infrastructure. The purpose of use, headcount and delivery level are clarified. Expected from you: title deed or plot information, zoning status if available, a description of how you will use the building.

2. Design

For standard products a plan is selected from the catalogue; for custom projects architectural and structural designs are prepared. For buildings subject to a licence, this stage runs together with the licence file. Expected from you: plan approval. Production does not start until approval is given; this is where time is most often lost in the process.

3. Contract and production plan

Scope, item list, delivery date and payment plan are written into the contract. The production planning department schedules the job; material orders are placed. If main materials such as galvanized sheet, panels and windows are in stock, production starts immediately.

4. Factory production

Light steel profiles are produced on roll-forming lines, panels on the panel line and container bodies on the welding line. Electrical and plumbing installations, windows and interior cladding are installed at the factory. Typical duration: days for a stock container, a few weeks for a custom prefabricated building, a block-by-block schedule for multi-block projects. At this stage you can carry out an interim inspection at the factory if you wish.

5. Quality control

Dimension, weld, paint, insulation and services tests are carried out during and at the end of production; the documents are added to the file. The final pre-shipment check is photographed.

6. Shipping

Monoblock units are shipped whole by truck, knock-down systems packed. The site must be ready on the day of transport: foundation poured and cured, road open, space for the crane. A site that is not ready is the second most common cause of delay; we confirm the shipping date together.

7. Assembly

For containers, placement and line connection are measured in days; for prefabricated and light steel buildings, frame and panel assembly in weeks. Facade, roof, windows and interior partitions are completed in sequence. The assembly crew and crane are our organisation; the electrical and water connection points must be ready on site.

8. Handover and after

The building is walked through together, a snag list is drawn up and closed; the handover report is signed. The user manual, maintenance notes and warranty documents are handed over. For licensed buildings, the occupancy permit application is made at this stage.

Three points that cause delay

  • Late plan approval: Production does not start without approval.
  • Site not ready: Foundation, road and infrastructure must be ready by the shipping day.
  • Requests outside the scope: Changes added during production alter the schedule and budget; collecting changes at the design stage is the most economical way.

If you would like us to put the process on a schedule for your project, share your list of needs; we will get back within 48 hours.

Get a Quote

Get a price quote for this product

With dimensions and equipment tailored to your project, we will get back to you within 48 hours.

Read more

Other Articles

Galvanized light steel lattice truss on the factory floor, AFAD containers behind
Guide

Building Permits for Prefabricated Buildings: How Does the Licensing Process Work?

Do prefabricated and light steel buildings need a permit? Zoning status, architectural and structural design, building

22.09.2026 · 7 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

What Makes Up the Cost of a Prefabricated Building? An Item-by-Item Budget Guide

The items that make up the budget of a prefabricated or container building: structural system, panels and insulation,

22.09.2026 · 8 dk okuma →
Galvanized steel coil carried by forklift, Aşıcı Grup production plant
Guide

How Many Years Does a Prefabricated or Light Steel Building Last? A Maintenance Guide

The factors that determine the service life of prefabricated, container and light steel buildings; an annual

22.09.2026 · 6 dk okuma →
Workers producing steel profiles on the roll-forming line, Polatlı factory
Guide

Prefabricated House Costs in 2026: 7 Factors That Set the Price

What makes prefabricated house prices vary? We explain the seven main cost drivers — floor area, insulation, number of…

01.08.2026 · 6 min read →
Galvanized light steel profiles stacked in the production hall, overhead crane
Comparison

Container or Prefabricated Building? A Comparison to Help You Choose

What are the differences between a container and a prefabricated building? We compare the two on portability, cost…

20.07.2026 · 5 min read →
Galvanized light steel lattice truss on the factory floor, AFAD containers behind
Engineering

Are Light Steel Buildings Really Earthquake-Resistant?

Why are light steel buildings considered earthquake-safe? We explain their seismic performance in terms of low weight…

05.07.2026 · 7 min read →
Galvanized steel coil carried by forklift, Aşıcı Grup production plant
Sustainability

Fully Recyclable Steel and the Future of Sustainable Construction

Why is steel the key to sustainable building? We look at steel construction through recycling, low waste, energy…

18.06.2026 · 5 min read →